6 issues in roads with high priority

HighRoads

WYDOT Acceptance of East 5th Street

Trucks keep jumping the curb at Fifth and Main because the corner radius is too tight. The city is fixing that corner now, redesigning Fifth and Val Vista next, and planning a bridge deck replacement next summer that will detour truck traffic.

3 mentions (1 this month)Last discussed Oct 12, 2026
HighRoads

2026 Construction Season

The building division reported a strong season: 138 major permits, nearly 800 simple permits, and 1,940 inspections from March through September, with notable projects including the Sheridan College science center and a student-built house.

9 mentionsLast discussed Oct 5, 2026
HighRoads

Dry Ranch Road emergency access bottleneck

One access point serves the whole Heartland Drive/Solutions Way/Dry Ranch Road area, and fire flow can't reach the highest lots. Improvements are coming with this subdivision, but a true second access depends on future deals with other property owners.

3 mentionsLast discussed Sep 28, 2026
HighRoads

Sheridan Transportation Plan

A $249,922.73 award to Stantec for a citywide safety action plan, mostly covered by a $200,000 federal grant. A resident questioned choosing a Canada-headquartered firm over Wyoming companies, prompting the item to be pulled from consent for discussion.

7 mentionsLast discussed Aug 10, 2026
HighRoads

Terra-Turner road rehabilitation project

About 6,000 linear feet of road in the commercial area around Sheridan Avenue, Riverside, Terra and Turner gets a full rotomill and overlay with cement-treated base, plus curbing, sidewalk/ADA and storm drain fixes. The area has had pooling water and beat-up pavement, made worse by the 2025 water line project.

2 mentionsLast discussed Aug 3, 2026
HighRoads

2026 Micro-surface Pavement Preservation Project

About 62,000 square yards of streets south of 11th Street would get a micro-surface treatment — a roughly $5-per-square-yard preventive seal that stretches road life before costly mill-and-overlay rebuilds. Funded entirely by the one-cent CapTax and GPET funds.